Showing posts with label walking foot. Show all posts
Showing posts with label walking foot. Show all posts

Wednesday, 15 May 2019

Mini Wonders table runner.

https://www.elmstreetquilts.com/2019/05/one-monthly-goal-may-goal-setting-link.htmlFinish-A-Long 2019 logo
              

My Mini Wonders Table Runner is finished and in use on the dining table. This is my first finish for the 2019 Q2 Finish Along list, and was also my one monthly goal for May.


The pattern is by Sheila Christensen and was published in instalments in six issues of "Make Modern". This design looks as if it might be EPP, but in fact it's ordinary piecing; all the pieces are cut from strips using a 60 degree ruler. The strips are either 1.5" or 2.5".

I quilted the border sections and the white pieces in the large hexagons with the walking foot and the setting triangles free motion.

 Fabric

The coloured hexagons are made using two fabrics in each of six colours. I used Alison Glass fabrics from various series.
The borders are white and three shades of grey.
For the binding I cut 2" strips of several of the fabrics used in the table runner,
The backing is "Basicgrey compositions" from Moda (the second word may be something else - it is so faint)
I both pieced and quilted with Aurifil 50wt. colour 2600, dove grey.

I'm linking this week to:

Needle and Thread Thursday     https://anjaquilts.blogspot.com/2019/05/tgiff-hands2help-comfort-quilt.html
Click on the buttons above to view more new quilts.

I'm linking to "One Monthly Goal" at Elm Street Quilts,
and to 2019 Finish Along at Studio sew of course at the end of June.
Then you'll be able to view other people's progress by clicking on these links.

Happy sewing

Marly.

Thursday, 1 November 2018

One Monthly Goal in November

My goal for November is to finish the play mat for my twin grandchildren who are expected in December.

Here it is:


It was also my goal for October, but it's still not finished!

Yet another goal not reached! I had the top sewn together early in October, but the quilting is heavy going: a combination, I think, of a double layer of wadding and Ikea furnishing cotton as backing.
When I roll the fabric up the roll is so bulky I can't see over it if I'm sitting at the machine so I've resorted to standing. I didn't expect that to be so easy; I certainly have a better view of the fabric, and more control of what's happening. I had a problem at first controlling the speed, being rather heavy-footed when my legs got tired. That was quickly remedied by taking a break regularly and doing something else, like writing this blog post!


There's not much more to be done to the mat, just quilting a few more diagonal lines, trimming, provisionally binding and washing. I read that I can expect up to 10% shrinkage on quilting cotton so I added that, plus a bit extra, all round. I'm going to provisionally bind it on the machine with a long stitch, and then trim it finally after washing, and then reattach the binding permanently.

That shouldn't take me so long! Well, we'll see at the end of November!

I'm linking to Patty at  

OMG November Link-Up is OPEN!

click on the button above to see more November goals.

Happy sewing

Marly.

Tuesday, 27 February 2018

February's monthly goal ...


... for One Monthly Goal was to at least start quilting the rainbow bears square dance.


Well I've started.


Using the walking foot I've nearly finished quilting wobbly lines in the negative space / wide sashings. Originally I was going to do straight lines, but there was a practical problem as the sashings are different widths, and I couldn't work out how to manage the transition from wide to narrower. This way the lines just wobble closer together. All this wobbling: the bears not only stepped in the paint pots, they partook of a wee dram too many as well!

This will carry over to my goal for March as I still have to quilt the bears' paws. That will be FMQ; probably also wobbly lines, although not deliberately!

I'm linking up to

 http://www.elmstreetquilts.com/2018/02/one-monthly-goal-february-finish-link-up.html

Click on the button to see what other crafters have achieved this month.


Happy sewing

Marly.

Friday, 4 August 2017

Allietare! finished, at last



I have a second finish to report this week. This one was really a UFO, as it was the Quiltville mystery from December 2015 of which I finished the piecing well over a year ago. It took me another six months to get the borders done.



After my frustration while quilting Star Light, Star Dark I decided on simple all-over "circles-on-a-string" in the centre section which was so easy (but still with the odd pointed bit in a circle here or there!) and on a vine with leaves and bunches of grapes in the corners (a nod to Chianti here) for the outer border.



I could have used any colour thread on the border but because my quilting often has those erratic hooks in it I decided to match the thread to the border fabric. Have you ever tried sewing black on black? Well mistakes certainly wouldn't have been noticeable; when I finished the first leaf I couldn't see where it had begun. When you sew white on white the stitches have shadows; you can't see the shadows on black. It's a shame about the Chianti but it was not to be! More unpicking, and then I quilted "tramlines" with the walking foot - easy and .... boring!

Tramlines! Alas no Chianti!
I was really happy to have this finished and ready to be used this winter.

Fabric: assorted from stash, mostly scraps
Thread: Aurifil light grey (
Wadding: cotton from my LQS
Size 1.75m x 1.75m

I'm linking up to
https://kathyskwiltsandmore.blogspot.nl/2017/08/tgiff-august-4th.html?showComment=1501868172935#c6122758149277913040 
So pop over there and see what else has been finished this week.

Happy sewing

Marly.