1. Modern Maple throw

is pieced and assembled and waiting for quilting.
2. Mini Quilt
![]() |
pattern: "Drawn Together" by Sarah Fielke |
3. Sew Together bag
| pattern by So Dememted; photo: Craftsy; |
This has been on my list before, and the only thing preventing me from starting is that I need to buy fusible interfacing that is firmer than the type I have now. I need to make a trip to the city (which isn't far - that's no excuse!) and REMEMBER to buy it. Having written this the battle is half over!
4. Mola cat

Started in a workshop in September, I need to finish the sewing and devise some use for it. It rather depends on the latter whether or not this gets finished.
5. Origami flower
I started this in a workshop in August, and the same goes for the origami flower as for the Mola cat. Really it's finished except for finding a use for it, or a way to display it.
6. Poinsettia table topper - Drunkard's path
![]() |
| Drunkard's path QAL at SpringLeaf Studios |
Deadline: Christmas!
This all looks achievable within three months doesn't it?
I'm linking up with Adrianne On the Windy Side so click on the link to see what other projects should be finished before 1 January 2016.
Happy Sewing
Marly








